Evidence workspace
Five sources. Three realities. One traceable record.
Browse the fictional materials used to build MetroMove’s sample Reality Map and gaps. Every quoted finding links back to this source text.
01
Organizational intent
MetroMove pilot management requirements
Approved outcomes, operating expectations, and controls for the fictional pilot.
- Prepared by
- Pilot steering committee
- Date
- May 6, 2026
- Length
- 934 chars
Inspect source
02
Organizational intent
Pilot budget and operating assumptions
Budget boundaries, staffing assumptions, and ownership for the fictional pilot.
- Prepared by
- Finance and pilot operations
- Date
- May 13, 2026
- Length
- 917 chars
Inspect source
03
Field reality
Driver discovery interview notes
Synthesized observations from fictional pilot-driver interviews.
- Prepared by
- Field research lead
- Date
- May 21, 2026
- Length
- 967 chars
Inspect source
04
Field reality
Rider support feedback summary
Fictional rider expectations and support observations before the pilot.
- Prepared by
- Customer support research lead
- Date
- May 24, 2026
- Length
- 730 chars
Inspect source
05
Technical reality
Current architecture and feature summary
Current-state architecture and implemented feature boundaries for the fictional product.
- Prepared by
- Platform engineering lead
- Date
- May 28, 2026
- Length
- 1,245 chars
Inspect source